- Home
- Lod
- Services
- Kia
- Body repair and painting
- Raptor painting
Raptor painting for Kia in Lod
10 companies found
Abu Suleiman Gamal-G.E.
- Car Service
- Open Will close at 17:00
- Modi'in St 4, Lod
English ,Hebrew

Garage Segnon Lod
- Car Service
- Open Will close at 18:00
- Rabi Eli'ezer Ben Horkanos St 12, Lod
English ,Hebrew

Ahim Baba
- Car Service
- Open Will close at 17:00
- HaTsorfim St 16, Lodהצורפים 16 א.ת צפוני לוד
English ,Hebrew
Garage Aaron
- Car Service
- Open Will close at 17:00
- Modi'in St 4, Lod
English ,Hebrew
Bason Aharon
- Car Service
- Open Will close at 17:00
- Y.L. Pinsker St 40, Lod
English ,Hebrew
Ha`Tsevet Alenkib
- Car Service
- Open Will close at 23:00
- Modi'in St 4, Lod
English ,Hebrew
Achim Alkram
- Car Service
- Open Will close at 17:00
- Herzog 7, Lod
English ,Hebrew
Basson M.M.
- Car Service
- Open Will close at 17:00
- Modi'in St 4, Lod
English ,Hebrew
Webcar Shirytei Rehev
- Car Service
- Closed Will open on Monday at 07:30
- שדרות שוורץ, 7, לוד
English ,Hebrew

Garage Iris
- Car Service
- Open Will close at 17:00
- HaMelacha St 15, Lod, Israel
English ,Hebrew
Raptor painting
Raptor painting
The Raptor polyurethane coating is applied to enhance the protection of the car body from chemical attack, corrosion, fading and other external influences. Before proceeding with the painting, it is required to dismantle all the elements that are not supposed to be painted - mirrors, handles, etc. Then, the body is cleaned from the old coating, rust and other defects. Dents and damages are subjected to leveling and puttying, and the entire surface to be treated is degreased. After that, the required number of Raptor layers is applied. The polymerization of this coating takes place within a week.