- Home
- Afula
- Services
- Exhaust system
- Exhaust pipe replacement
Exhaust pipe replacement in Afula
37 companies found
Monza
- Car Service
- Closed Will open on Sunday at 09:00
- HaSartat St 18, Afula
English ,Hebrew

Hysam at Hysam
- Car Service
- Closed Will open on Friday at 07:30
- Haim Laskov St 1, Afula
English ,Hebrew

Matan
- Car Service
- Closed Will open on Friday at 07:30
- Ha-Magal St 12, Afula
English ,Hebrew
Ariel
- Car Service
- Closed Will open on Sunday at 08:00
- Kehilat Tsiyon St 17, Afula
English ,Hebrew
Abed Al'hadi
- Car Service
- Closed Will open on Friday at 07:30
- Ha-Khermesh St 12, Afula
English ,Hebrew
Sprinter Garage
- Car Service
- Closed Will open on Sunday at 08:00
- Ha-Melakha St 4, Afula
English ,Hebrew
Afula
- Car Service
- Closed Will open on Sunday at 07:30
- Ha-Nasi Weizman St 22, Afula
English ,Hebrew
Garage Ha'Ahim Sharbet
- Car Service
- Closed Will open on Sunday at 08:00
- HaRav Nahum Levin St 10, Afula
English ,Hebrew
Tali Katz
- Car Service
- Closed Will open on Sunday at 07:30
- Tsvi Pinkas St 39, Afula
English ,Hebrew
AB Afula
- ShowroomCar Service
- Closed Will open on Friday at 07:30
- Kehilat Tsiyon St 23, Afula
English ,Hebrew
Honda Afula
- Car Service
- Closed Will open on Friday at 06:30
- Sderot Menachem Begin 66, Afula
English ,Hebrew ,Russian
Ben Moshe Ovadia&Banav
- Car Service
- Closed Will open on Friday at 08:00
- Kehilat Tsiyon St 18, Afula
English ,Hebrew
Exhaust pipe replacement
Exhaust pipe replacement
The exhaust pipe connects the exhaust manifold and the catalyst, the exhaust manifold and the muffler, the turbocharger. The exhaust pipe needs to be replaced in the presence of the following signs: increased fuel consumption, engine malfunctions with loss of power, and a characteristic odor in the passenger compartment. The exhaust pipe removal procedure involves disconnecting the exhaust pipe from the exhaust manifold and the exhaust gas neutralizer, removing the suspension elements from the bracket on the exhaust pipe. After that, the exhaust pipe is removed, and the installation of a new pipe is carried out in the reverse order.