- Home
- Afula
- Services
- Exhaust system
- Exhaust pipe replacement
Exhaust pipe replacement in Afula
37 companies found
Ashraf
- Car Service
- Closed Will open on Monday at 08:00
- Moshe Sharet St 64, Afula
English ,Hebrew
Odathalla Amin
- Car Service
- Closed Will open on Monday at 08:00
- Kehilat Tsiyon St 20, Afula
English ,Hebrew
Hysam at Hysam
- Car Service
- Closed Will open on Monday at 07:30
- Haim Laskov St 1, Afula
English ,Hebrew
Ha`Mikzoanim
- Car Service
- Closed Will open on Monday at 07:30
- Kehilat Tsiyon St 4, Afula
English ,Hebrew
Abed Alhadi
- Car Service
- Closed Will open on Monday at 07:30
- Ha-Khermesh St 10, Afula
English ,Hebrew
Diesel Ha-Emek
- Car Service
- Closed Will open on Monday at 08:00
- Ha-Nasi Weizman St 22, Afula
English ,Hebrew
Ben Moshe Ovadia&Banav
- Car Service
- Closed Will open on Monday at 08:00
- Kehilat Tsiyon St 18, Afula
English ,Hebrew
Emuna Afula
- Car Service
- Closed Will open on Monday at 07:30
- Kehilat Tsiyon St 29, Afula
English ,Hebrew
Ariel
- Car Service
- Closed Will open on Monday at 08:00
- Kehilat Tsiyon St 17, Afula
English ,Hebrew
Mirkaz Achim Id
- Car Service
- Closed Will open on Monday at 08:30
- Ha-Melakha St 10, Afula
English ,Hebrew
Sprinter Garage
- Car Service
- Closed Will open on Monday at 08:00
- Ha-Melakha St 4, Afula
English ,Hebrew
Garage Afula
- Car Service
- Closed Will open on Monday at 08:00
- Kehilat Tsiyon St 35, Afula
English ,Hebrew
Exhaust pipe replacement
Exhaust pipe replacement
The exhaust pipe connects the exhaust manifold and the catalyst, the exhaust manifold and the muffler, the turbocharger. The exhaust pipe needs to be replaced in the presence of the following signs: increased fuel consumption, engine malfunctions with loss of power, and a characteristic odor in the passenger compartment. The exhaust pipe removal procedure involves disconnecting the exhaust pipe from the exhaust manifold and the exhaust gas neutralizer, removing the suspension elements from the bracket on the exhaust pipe. After that, the exhaust pipe is removed, and the installation of a new pipe is carried out in the reverse order.