- Home
- Bat Yam
- Services
- Maintenance
- Drive belt replacement
Drive belt replacement in Bat Yam
23 companies found
Mor Shalom
- Car Service
- Open Will close at 14:00
- Ort Israel St 34, Bat Yam
English ,Hebrew
Garage Djambo Bat-Yam
- Car Service
- Open Will close at 13:30
- HaPlada St 7, Bat Yam
English ,Hebrew
Auto Alex
- Car Service
- Open Will close at 13:00
- Israel Vishengrad Ha-Masger St 7, Bat Yam
English ,Hebrew ,Russian
Garage Yad
- Car Service
- Open Will close at 14:00
- Israel Vishengrad Ha-Masger St 3, Bat Yam, Israel
English ,Hebrew
Bimmer Bat Yam
- Car Service
- Open Will close at 15:00
- Ort Israel St 32, Bat Yam
English ,Hebrew ,Russian
Ha-Sela
- Car Service
- Open Will close at 13:00
- Ehud Kinnamon St 4, Bat Yam
English ,Hebrew
Ofanoei Bat Yam
- Car Service
- Open Will close at 13:00
- Ehud Kinnamon St 3, Bat Yam
English ,Hebrew
Garage Shalom
- Car Service
- Closed Will open on Sunday at 08:00
- Ehud Kinnamon St 39, Bat Yam
English ,Hebrew
Vaknin Yosef
- Car Service
- Open Will close at 12:30
- HaOrgim St 22, Bat Yam
English ,Hebrew
Zameret, Bat Yam
- Car Service
- Open Will close at 12:00
- HaOrgim St 17, Bat Yam
Hebrew ,Russian
Izki
- Car Service
- Open Will close at 14:00
- HaOrgim St 31, Bat Yam
English ,Hebrew
Emir
- Car Service
- Open Will close at 14:30
- Ehud Kinnamon St 28, Bat Yam
English ,Hebrew
Drive belt replacement
Drive belt replacement
The drive belt is replaced if it is worn out, which can be indicated by such signs as a whistle when starting the engine or at high speeds, the indicator signals confirming a decrease in generator performance, the appearance of stains of oil, fuel and other operating fluids and cracks, scuffs, loose threads and other defects detected in the course of visual inspection. To replace the belt, disconnect the battery, unscrew the tension roller screw to loosen it and dismantle the belt from the camshaft, roller shafts and pump shaft. Dismantle the drive shaft retaining screw, and then remove the crankshaft pulley, the component drive fastener and the belt. Installation of the device is carried out in the reverse order.