- Home
- Kiryat Ata
- Services
- Maintenance
- Drive belt replacement
Drive belt replacement in Kiryat Ata
21 companies found
Garage Ganim Hadj
- Car Service
- Open Will close at 16:00
- Yosef Batsri St 8, Kiryat Ata
English ,Hebrew
M.D.O
- Car Service
- Open Will close at 17:00
- Derech Haifa 33, Kiryat Ata
Hebrew
Garage Ha-Achim Kiryat Ata
- Car Service
- Open Will close at 17:30
- Derech Haifa 33, Kiryat Ata, Israel
English ,Hebrew
Shironi A.I.
- Car Service
- Open Will close at 17:00
- Derech Haifa 17, Kiryat Ata
English ,Hebrew
Fadida Transportations
- Car Service
- Open Will close at 19:00
- Shlomo Ben Yosef St 29, Kiryat Ata
English ,Hebrew
Garage Dudu
- Car Service
- Open Will close at 17:00
- Derech Haifa 27, Kiryat Ata
English ,Hebrew
Edelman Arieh
- Car Service
- Open Will close at 17:00
- Derech Haifa 6, Kiryat Ata
English ,Hebrew
Daud Moris
- Car ServiceEvacuator
- Open Will close at 16:00
- Derech Deshanim 25, Kiryat Ata
English ,Hebrew
Garage Ha'Moil
- Car Service
- Open Will close at 17:00
- Derech Haifa 18, Kiryat Ata
English ,Hebrew
Noga
- Car Service
- Open Will close at 16:30
- HaMa'apilim St 21, Kiryat Ata
English ,Hebrew
Salah Garage Kiryat Ata
- Car Service
- Open Will close at 17:00
- Zevulun St 164, Kiryat Ata
Hebrew
Masa Ganim
- Car Service
- Open Will close at 17:00
- Ha-Ta'asiya St 1, Kiryat Ata
English ,Hebrew
Drive belt replacement
Drive belt replacement
The drive belt is replaced if it is worn out, which can be indicated by such signs as a whistle when starting the engine or at high speeds, the indicator signals confirming a decrease in generator performance, the appearance of stains of oil, fuel and other operating fluids and cracks, scuffs, loose threads and other defects detected in the course of visual inspection. To replace the belt, disconnect the battery, unscrew the tension roller screw to loosen it and dismantle the belt from the camshaft, roller shafts and pump shaft. Dismantle the drive shaft retaining screw, and then remove the crankshaft pulley, the component drive fastener and the belt. Installation of the device is carried out in the reverse order.