- Home
- Lod
- Services
- Maintenance
- Oil pump replacement
Oil pump replacement in Lod
22 companies found
Universal
- Car Service
- Closed Will open on Sunday at 08:00
- Aba Hillel Silver St 12, Lod
English ,Hebrew
Marco Garage, Lod
- Car Service
- Closed Will open on Sunday at 08:00
- Yoseftal St 5, Lod
English ,Hebrew
Ad Chen
- Car Service
- Closed Will open on Sunday at 07:30
- Modi'in St 4, Lod
English ,Hebrew
Garage Shirut Mair
- Car Service
- Closed Will open on Saturday at 08:00
- HaMasger St 1, Lod
English ,Hebrew
Garage Lod
- Car Service
- Closed Will open on Sunday at 07:00
- HaMehkar St 31, Lod
English ,Hebrew
Webcar Shirytei Rehev
- Car Service
- Closed Will open on Monday at 07:30
- שדרות שוורץ, 7, לוד
English ,Hebrew
Adir
- Car Service
- Closed Will open on Sunday at 08:00
- Rabi Eli'ezer Ben Horkanos St 5, Lod
English ,Hebrew
Garage Ha'Ahim Kabua
- Car Service
- Closed Will open on Sunday at 08:00
- Etsel St 19, Ramla
English ,Hebrew
Garage Express Lod
- Car Service
- Closed Will open on Sunday at 08:00
- Sderot Hativat Yiftach 5, Lod
English ,Hebrew
Eliyahu
- Car Service
- Closed Will open on Sunday at 08:00
- Moshe Hess St 5, Lod
Hebrew
Garage Oto Tov
- Car Service
- Closed Will open on Sunday at 08:00
- HaTsorfim St 15, Lod
English ,Hebrew
Garage Dahaf
- Car Service
- Closed Will open on Sunday at 08:00
- Ben Gurion Airport, 7015001
English ,Hebrew
Oil pump replacement
Oil pump replacement
The oil pump needs to be replaced in the following cases: the oil receiver mesh is clogged; the flow regulation valve is faulty; the inner surface of the pump housing or working surfaces is worn out, and so on. Such signs as a decrease or an increase in oil pressure in the engine, as well as an increase in oil consumption may indicate a malfunction of the pump. To replace the oil pump, drain the engine oil, remove the crankshaft timing pulley, remove the oil pallet, unscrew the oil receiver fasteners and remove the oil receiver. Next, remove the bolts of the oil pump and the oil pump itself. The installation of a new pump is carried out in the inverse order.