- Home
- Nazareth
- Services
- Maintenance
- Oil pump replacement
Oil pump replacement in Nazareth
40 companies found
Garage Kasabri Naim
- Car Service
- Closed Will open at 08:00
- 129, Nazareth
English ,Hebrew
Atid
- Car Service
- Closed Will open on Sunday at 07:30
- 129, Nazareth
English ,Hebrew
Ha`Minchara
- Car Service
- Closed Will open on Sunday at 08:30
- 129, Nazareth
English ,Hebrew
Abu Ramzi
- Car ServiceEvacuator
- Closed Will open at 08:00
- 5019 St 3, Nazareth
English ,Hebrew
Sharbel
- Car Service
- Closed Will open on Sunday at 07:30
- Al-Bishara St 35, Nazareth
English ,Hebrew
Garage Krabali Balal
- Car Service
- Closed Will open at 08:00
- 129, Nazareth
English ,Hebrew
Amin Nazareth
- Car Service
- Closed Will open at 08:30
- Gar Ha`Kfiza 3 , Nazareth
English ,Hebrew
Service Center Zippori
- Car Service
- Closed Will open at 08:00
- Alchakim Print/Wadi Al Hajaj, Nazareth
English ,Hebrew
Ibrahim Abd Elhadi
- Car Service
- Closed Will open on Sunday at 08:00
- Nazareth Towers, Nazareth
English ,Hebrew
Ibrahim Farage Zoabi
- Car Service
- Closed Will open on Sunday at 08:00
- Nazareth Towers, Nazareth
English ,Hebrew
Issa Adnan
- Car Service
- Closed Will open on Sunday at 08:30
- 129, Nazareth
English ,Hebrew
Garage Brothers Avod Mercedes
- Car Service
- Closed Will open at 08:30
- אבורביה עמר, שכונה מזרחית 712/21, Nazareth, Israel
English ,Hebrew
Oil pump replacement
Oil pump replacement
The oil pump needs to be replaced in the following cases: the oil receiver mesh is clogged; the flow regulation valve is faulty; the inner surface of the pump housing or working surfaces is worn out, and so on. Such signs as a decrease or an increase in oil pressure in the engine, as well as an increase in oil consumption may indicate a malfunction of the pump. To replace the oil pump, drain the engine oil, remove the crankshaft timing pulley, remove the oil pallet, unscrew the oil receiver fasteners and remove the oil receiver. Next, remove the bolts of the oil pump and the oil pump itself. The installation of a new pump is carried out in the inverse order.