Drive belt replacement in Rishon LeZion
86 companies found
B.N. Garage
- Car Service
- Open Will close at 17:00
- Rishon LeZion, Herzl St 2
English ,Hebrew

Dudi Or
- Car Service
- Open Will close at 17:00
- Rishon LeZion, Plotitsky St 3
English ,Hebrew

Service Center Bitran
- Car Service
- Open Will close at 16:30
- Rishon LeZion, Moshe Sharett St 13
English ,Hebrew
Garage Oto Front
- Car Service
- Open Will close at 16:30
- Rishon LeZion, Binyamin Shmotkin St 29
English ,Hebrew

UMI Central Service Center
- Car Service
- Open Will close at 16:30
- Rishon LeZion, Naftali Faltin St 5
English ,Hebrew
Michael Sabat
- Car Service
- Open Will close at 17:00
- Rishon LeZion, מיכאל סבט מוסך רדיאטורים
English ,Hebrew
Diesel Rascheltz
- Car Service
- Open Will close at 17:00
- Rishon LeZion, Moshe Sharett St 8
English ,Hebrew

Garage Amit Motors
- Car Service
- Open Will close at 16:00
- Rishon LeZion, Yosef Lishanski Blvd 8
English ,Hebrew
Garage Gali
- Car Service
- Open Will close at 16:30
- Rishon LeZion, Etsel St 7
English ,Hebrew

Lubinsky National Service Center
- Car Service
- Open Will close at 16:30
- Rishon LeZion, Sorek Business Center, Mark Moshavitz 3
English ,Hebrew
Maya
- Car Service
- Open Will close at 17:00
- Rishon LeZion, Freiman St 5
English ,Hebrew

Otto Shay
- Car Service
- Open Will close at 16:00
- Rishon LeZion, Etsel St 21
English ,Hebrew
Drive belt replacement
The drive belt is replaced if it is worn out, which can be indicated by such signs as a whistle when starting the engine or at high speeds, the indicator signals confirming a decrease in generator performance, the appearance of stains of oil, fuel and other operating fluids and cracks, scuffs, loose threads and other defects detected in the course of visual inspection. To replace the belt, disconnect the battery, unscrew the tension roller screw to loosen it and dismantle the belt from the camshaft, roller shafts and pump shaft. Dismantle the drive shaft retaining screw, and then remove the crankshaft pulley, the component drive fastener and the belt. Installation of the device is carried out in the reverse order.