Drive belt replacement

Drive belt replacement in Rosh HaAyin

12 companies found

Garage Ha-Gesher
  • Car Service
  • Closed Will open on Sunday at 08:00
  • ראש העין - כביש 5 בין פונדק פפאיה לעמנואל רהיטים, יציאה לכיוון ת"א מפארק סיבל ראש העין, Rosh Haayin, Israel
  • EnglishHebrew
  • 03-9381634
Millenium Rosh Haayin
  • Car Service
  • Closed Will open on Sunday at 08:00
  • Ha-Avoda St 14, Rosh Haayin
  • Authorized by Finances
  • Hebrew
  • 03-9380595
Colmobil
  • Car Service
  • Closed Will open on Sunday at 08:00
  • Amal St 20, Rosh Haayin
  • Authorized by Finances
  • EnglishHebrew
  • 02-6520888
Siani Garage
  • Car Service
  • Closed Will open on Sunday at 08:00
  • Ha-Ta'asiya St 5, Rosh Haayin
  • EnglishHebrew
  • 03-9389993
Hoze Israel A.G.
  • Car Service
  • Closed Will open on Sunday at 07:30
  • Ha-Yetsira St 10, Rosh Haayin
  • EnglishHebrew
  • 03-9027902
Mapatan Meainot
  • Car Service
  • Closed Will open on Sunday at 08:30
  • Ha-Matmid St 18a, Rosh Haayin
  • EnglishHebrew
  • 03-9380387
Garage Gal-Ad
  • Car Service
  • Closed Will open on Sunday at 08:00
  • Ha-Avoda St 17, Rosh Haayin, Israel
  • EnglishHebrew
  • 052-3457510
Garage Nayad
  • Car Service
  • Closed Will open on Sunday at 08:00
  • Prof. Volf Vagner St 5, Rosh Haayin, Israel
  • EnglishHebrew
  • 052-3501371
Garage Ha'Atzmaut
  • Car Service
  • Closed Will open on Sunday at 07:30
  • Ha-Yetsira St 15, Rosh Haayin
  • EnglishHebrew
  • 03-9102581
Eden
  • Car Service
  • Closed Will open on Sunday at 08:00
  • Ha-Avoda St 40, Rosh Haayin
  • EnglishHebrew
  • 03-9388000

The drive belt is replaced if it is worn out, which can be indicated by such signs as a whistle when starting the engine or at high speeds, the indicator signals confirming a decrease in generator performance, the appearance of stains of oil, fuel and other operating fluids and cracks, scuffs, loose threads and other defects detected in the course of visual inspection. To replace the belt, disconnect the battery, unscrew the tension roller screw to loosen it and dismantle the belt from the camshaft, roller shafts and pump shaft. Dismantle the drive shaft retaining screw, and then remove the crankshaft pulley, the component drive fastener and the belt. Installation of the device is carried out in the reverse order.