- Home
- Services
- Installation of additional equipment
- LPG equipment installation
LPG equipment installation in Israel
22 companies found
Tachometer
- Car Service
- Closed Will open on Sunday at 08:30
- Unnamed Road
English ,Hebrew

Garage Lehavot Ha'Bashan
- Car Service
- Closed Will open on Sunday at 08:00
- Lehavot HaBashan Garage
English ,Hebrew

Gas Saver
- Car Service
- Closed Will open on Sunday at 08:00
- HaHaroshet St 10, Kiryat Malakhi
English ,Hebrew

Autoservice Beeri
- Car ServiceTire service
- Closed Will open on Sunday at 07:30
- Be'eri, Be'eri
English ,Hebrew
Machon Le Tachografim
- Car Service
- Closed Will open on Sunday at 08:00
- HaYozma St 29, Ashdod
English ,Hebrew

Garage Super Car
- Car Service
- Closed Will open on Sunday at 07:00
- 28, Nahariyya
English ,Hebrew
A.A. Alex
- Car Service
- Closed Will open on Sunday at 07:30
- HaPlada St 4, Bat Yam
English ,Hebrew ,Russian

Merkavot Ha'Mishne
- Car Service
- Closed Will open on Sunday at 07:00
- HaRatach St 9, Be'er Sheva
English ,Hebrew
Ovadia Garage
- Car Service
- Closed Will open on Sunday at 08:00
- HaTa'asiya St 5, Jerusalem
English ,Hebrew

Na-na
- Car Service
- Closed Will open on Sunday at 08:00
- Yosef Sapir St 5, Rishon LeTsiyon
English ,Hebrew ,Russian
Gaspro
- Car Service
- Closed Will open on Sunday at 08:00
- Gesher HaEts 10
English ,Hebrew

Garage Masmia
- Car Service
- Closed Will open on Sunday at 07:30
- Tsomet Reem-Masmia
English ,Hebrew
LPG equipment installation
LPG equipment installation
There are five generations of LPG equipment, but the fourth generation is the most popular. Installation of the 4th generation LPG equipment consists of several stages. The first stage involves installing the reducer by connecting it to the cooling system, installing an electromagnetic valve with a gas filter in the liquid phase, attaching a controller (ECU), and laying the wires from the reducer to the cylinder. The second stage involves the attachment of the cylinder and the multivalve. Next, the gas and vacuum fittings are cut. At each stage, the necessary pipes and nozzles are connected accordingly. After which the wiring and ECU are adjusted. Once the installation is completed, it is time to adjust the equipment.